Concrete Calculator

Calculate cubic yards, bags, and cost for slabs, footings, and foundations. Works for driveways, patios, and shed bases.

📊 Concrete Estimate

Volume (cubic feet)
Volume (cubic yards)
Bags Needed (with waste)
Material Cost
Delivery Fee
Total Estimated Cost

Always round up to the nearest half-yard when ordering ready-mix. Suppliers do not sell partial yards.

📑 Table of Contents

How Much Concrete Do I Need?

The most common mistake DIYers make with concrete is underestimating the volume. Concrete is sold by the cubic yard, but most people think in square feet. The missing piece is thickness. A 10×10 patio is 100 square feet, but at 4 inches thick it needs 1.23 cubic yards. At 6 inches, it needs 1.85 cubic yards. That is a 50% difference in material and cost.

Here is the exact formula contractors use:

Example: a 12×16 foot shed foundation, 4 inches thick. 12 × 16 = 192 sq ft. 4 inches ÷ 12 = 0.333 ft. 192 × 0.333 = 64 cubic feet. 64 ÷ 27 = 2.37 cubic yards. Add 5% waste = 2.49 cubic yards. Round up to 2.5 cubic yards.

How Many Bags of Concrete in a Cubic Yard?

This is the second most common question, and the answer depends entirely on bag size:

Most home improvement stores stock 80-lb and 60-lb bags. The 80-lb bag is the better value per pound of cement, but it is heavy. If you are working alone or mixing by hand in a wheelbarrow, 60-lb bags are easier to handle.

One important note: bagged concrete is convenient, but it is labor-intensive. Mixing 45 bags by hand in a wheelbarrow is a full day of backbreaking work. For anything over 1 cubic yard, strongly consider renting a small electric mixer (about $50/day) or ordering ready-mix.

How Thick Should a Concrete Slab Be?

Thickness is not just about strength—it is about what the slab needs to support and how long it needs to last:

Always check with your local building department before pouring footings or foundation slabs. They will have specific requirements based on your soil type, frost line depth, and local seismic activity.

Concrete Cost Per Cubic Yard (2026)

Concrete prices have risen steadily over the past few years due to fuel costs and cement shortages. Here is what you can expect to pay in 2026:

The math is simple: for projects under 1 cubic yard, bagged concrete is usually cheaper because you avoid delivery and short-load fees. For projects over 1 cubic yard, ready-mix is almost always the better value.

Bagged Concrete vs. Ready-Mix: Which Should You Choose?

Choose bagged concrete when:

Choose ready-mix concrete when:

One hybrid option: some suppliers offer "short-load" ready-mix service with a small truck. This is perfect for 1–3 yard projects. You get the convenience of pre-mixed concrete without the massive minimum order.

Disclaimer: This calculator provides estimates only. Actual concrete requirements vary based on form accuracy, surface conditions, and compaction. Always consult a structural engineer for foundation and footing work. HomeCalc Pro is not liable for material shortages or structural issues.
AdvertisementGoogle AdSense placeholder — responsive ad unit
Insert your AdSense code here after approval

Frequently Asked Questions

How much concrete do I need for a 10×10 slab?
For a 10×10 foot slab at 4 inches thick, you need approximately 1.23 cubic yards of concrete, or about 56 bags of 80-lb concrete mix. At 6 inches thick, you need 1.85 cubic yards or about 84 bags. Always round up to the nearest half-yard when ordering ready-mix concrete, as suppliers do not sell partial yards.
How many bags of concrete in a cubic yard?
One cubic yard of concrete requires approximately 45 bags of 80-lb concrete mix, or 60 bags of 60-lb mix. An 80-lb bag yields about 0.6 cubic feet of concrete, while a 60-lb bag yields about 0.45 cubic feet. For small projects, bagged concrete is convenient. For anything over 1 cubic yard, ordering ready-mix concrete from a supplier is usually cheaper and less labor-intensive.
How thick should a concrete slab be?
Most residential concrete slabs are 4 inches thick. Driveways and garage floors should be 5–6 inches thick to handle vehicle weight. Shed foundations and patios can be 4 inches. Footings for foundations are typically 8–12 inches thick and 16–24 inches wide, depending on local building codes and soil conditions. Always check with your local building department for specific requirements.
Should I use bagged concrete or ready-mix?
Use bagged concrete for projects under 1 cubic yard (about 45 bags of 80-lb mix). It is convenient, requires no delivery scheduling, and you can work at your own pace. For projects over 1 cubic yard, ready-mix concrete is almost always cheaper per cubic yard and saves enormous labor. A cubic yard of bagged concrete requires mixing 45 bags by hand or with a small mixer—ready-mix trucks deliver it pre-mixed and pour it directly.
How much does concrete cost per cubic yard?
As of 2026, the national average for ready-mix concrete is $130–$170 per cubic yard, depending on your location and the mix strength (PSI). Bagged concrete costs about $5–$7 per 80-lb bag, which works out to roughly $225–$315 per cubic yard. Delivery fees for ready-mix typically add $50–$100 per load. Short-load fees (under 3–5 cubic yards) may add another $50–$100.